Property Development Manager wanted for an 8-month contract

❗️NCCBC IS HIRING ❗️
Property Development Manager wanted for an 8-month contract
Flexible hours, Competitive rate
CLOSING DATE: MONDAY 17TH JULY
 

Designs for Kennedy Park Improvements

The document below includes proposed improvements to Kennedy Park to improve the experiences of both residents and visitors. This work was conducted by ARPL as part of NCCBC’s Foundations for Recovery Programme.

 

View ARPL’s Report here

 

 

Crosshill Overview – ARPL

This document contains an overview of the work conducted by ARPL in relation to Crosshill as part of the Foundations for Recovery Programme.

It includes:

Description
Asset Audit
Gap Analysis

View the report here.

Minishant Overview including ideas for Eco-Centre

This document contains an overview of the work conducted by ARPL in relation to Minishant as part of the Foundations for Recovery Programme.

It includes:

Description
Asset Audit
Gap Analysis

Eco Centre Proposal

View the report here.

Turnberry Overview

This document contains an overview of the work conducted by ARPL in relation to Turnberry as part of the Foundations for Recovery Programme.

It includes:

Description
Asset Audit
Gap Analysis

View the report here.

Dunure Heritage Centre – Designs & Report

This document contains an overview of the work conducted by ARPL in relation to a new Heritage Centre in Dunure, as part of the Foundations for Recovery Programme. 

The report includes:

Introduction
Description
Location
Design Drawings
Elemental specification
Cost estimates

View the report here.

Kirkoswald Overview including ideas for Readers Club & Low Cairn Hill

This document contains an overview of the work conducted by ARPL in relation to Kirkoswald as part of the Foundations for Recovery Programme.

It includes:

5.1 Description
5.2 Asset Audit

5.3 Gap Analysis
5.4 Readers Club
5.5 Low Cairn Hill

View the report here.

 

View the Appendix relating to the above below:

Appendix D – Condition Report for Reader’s Room

Kirkmichael Overview including McCosh Hall

This document contains an overview of the work conducted by ARPL in relation to Kirkmichael as part of the Foundations for Recovery Programme. including a full description, Asset Audit, Gap Analysis, and proposals for the McCosh Hall.

View the report here.  

View the Appendix relating to the above below:

Appendix D – Condition Report for McCosh Hall

Dunure Castle Report

This document contains work conducted by ARPL as part of the Foundations for Recovery Programme.

The Dunure Castle Structural Survey includes information on the following:

Structural Condition Review
Conservation Philosophy

Significance of Dunure castle and Dovecot
Conservation Maintenance Strategy
Site and building details
Building description and history

Condition of Building Fabric
Structural Survey – Engineer’s assessment
Photographs of current conditions
Recommended conservation and repairs – Architect and Structural Engineer
General maintenance recommendations
Current Record Drawings 2022

View the report here.

Click below to view the appendices relating to Dunure Castle below.

Appendix B1.2 Dunure Castle Archaeology 2000

Appendix B1.3 Dunure Castle WOSAS Site Report 1

Appendix B1.4 Dunure Castle WOSAS Site Report 2

Appendix B2 Dunure Castle Structural Report

Appendix B3 Dunure Castle Archive References

 

Dunure Harbour Report

This work was conducted by ARPL as part of NCCBC’s Foundations for Recovery Programme.

Click the links below to view the reports:

ARPL – DUNURE HARBOUR CONSERVATION STRATEGY

 

See below appendices relating to Dunure Harbour.

Appendix A1 – Dunure Harbour Archaeology

Appendix A2 Dunure Harbour Structural Report

Appendix A3 Dunure Harbour Ecology

Appendix A4 Scottish Lime Centre Report

Appendix A5 HES and Harbour Trust Consultation

Appendix A6.1 Archive Feasibility Study

Appendix A6.2 R Storrie History

Appendix A6.3 Halcrow Breakwater

Appendix A6.4 Harbour Geological Assessment 2